RISK MITIGATION FOR THE ADDITION OF PUBLIC ELECTRIC VEHICLE CHARGING STATIONS (SPKLU) AT PLN UP3 BOGOR
Main Article Content
Warhamni Samahdina
Nazaruddin
Mailita Tryana Sembiring
Petroleum as a result of current energy production, sooner or later petroleum will run out. For that, besides saving the use of energy from non-renewable natural resources, we must also look for alternative sources of new energy to meet energy needs that cannot be stopped anymore. Renewable electrical energy is energy that has a sustainable process such as solar power, wind power, water currents, geothermal energy, and biomass power. And currently the need for renewable electrical energy is important amidst the issue of global warming.
Brealey, Myears, & Marcus. (2008). Fundamentals of Corporate Financial Management. Fifth Edition. Volume Two. Jakarta: Erlanggaa.
Darmawi, H. (2010). Risk Management. Jakarta: Bumi Aksara
Dewi, D. (2012). Construction Risks in Conventional Power Plants, as Input for the Construction of the First Nuclear Power Plant in Indonesia. Indonesian Journal of Science and Technology Vol. 14, No. 2, 115-122.
Djohanputro, B. (2004). Value-Based Corporate Restructuring. Jakarta: PPM.
Ervianto, W. (2005). Construction Project Management. Yogyakarta: Andi Offset.
Gay, L., & Diehl, P. (1992). Research Methods for Business and Management. New York: Mac Millan Publishing Company.
Hadi, S., Shanti, K., & Fitri, P. (2013). Analysis of Risk Rating Determination of PT. XYZ Project with Analytical Hierarchy Process (AHP) Method. IENACO National Seminar
Hansen ST. MSC., S. (2017). Construction Contract Management – Practical Guidelines in Managing Construction Projects. Jakarta: Grasindo.
Hery. (2016). Integrated Business Management – Risk Management, Control and Governance, Supported by Internal Audit Function through Risk Based Internal Audit. Jakarta: Grasindo
Institute of Risk Management. (2018). A Risk Practitioners Guide to ISO 31000:2018. London: Institute of Risk Management
Irawan, J., Santoso, I., & M, S. (2017). Analysis Model and Risk Mitigation Strategy of Tempe Chips Production. Industria: Journal of Agro-Industry Technology and Management, 88-96.
ISO 31000, IO (2018). ISO 31000:2018 Risk Management - Guidelines. Switzerland: ISO Organization.
Joni. (2013). Analysis of Working Capital Needs and Cost Control Based on Cost Variance in Construction Projects. Scientific Journal of Civil Engineering.
Kountur. (2016). Easy Way of Integrated Risk Assessment – Quantitative Approach. Jakarta: RAP Indonesia.
Kountur, R. (2016). Operational Risk Management. Jakarta: PPM.
Lepar, F., Mandagi, R., & Lumeno, S. (2018). Risk Model at the Implementation Stage of Private Development Projects that Affect Project Performance. Jurnal Sipil Statik Vol.6 No.2 February, 125-136
Liu, H., & Tsai, Y. (2012). A Fuzzy Risk Assessment Approach for Occupational Hazards in the Construction Industry. Safety Science, 1067-1078.
Purwanto, E., & Gunarta, I. (2015). Determination of Electricity Selling Price Range and Investment Risk of Gas Turbine Rehabilitation at PT. X. Proceedings of the XXIII National Seminar on Technology Management, A-9-1 - A-9-7.
Rangkuti, F. (2012). Business & Investment Feasibility Study. Jakarta: Kompas Gramedia.
Saaty, T. (2008). Decision Making With The Analytic Hierarchy Process,
Brealey, Myears, & Marcus. (2008). Fundamentals of Corporate Financial Management. Fifth Edition. Volume Two. Jakarta: Erlanggaa.
Darmawi, H. (2010). Risk Management. Jakarta: Bumi Aksara
Dewi, D. (2012). Construction Risks in Conventional Power Plants, as Input for the Construction of the First Nuclear Power Plant in Indonesia. Indonesian Journal of Science and Technology Vol. 14, No. 2, 115-122.
Djohanputro, B. (2004). Value-Based Corporate Restructuring. Jakarta: PPM.
Ervianto, W. (2005). Construction Project Management. Yogyakarta: Andi Offset.
Gay, L., & Diehl, P. (1992). Research Methods for Business and Management. New York: Mac Millan Publishing Company.
Hadi, S., Shanti, K., & Fitri, P. (2013). Analysis of Risk Rating Determination of PT. XYZ Project with Analytical Hierarchy Process (AHP) Method. IENACO National Seminar
Hansen ST. MSC., S. (2017). Construction Contract Management – Practical Guidelines in Managing Construction Projects. Jakarta: Grasindo.
Hery. (2016). Integrated Business Management – Risk Management, Control and Governance, Supported by Internal Audit Function through Risk Based Internal Audit. Jakarta: Grasindo
Institute of Risk Management. (2018). A Risk Practitioners Guide to ISO 31000:2018. London: Institute of Risk Management
Irawan, J., Santoso, I., & M, S. (2017). Analysis Model and Risk Mitigation Strategy of Tempe Chips Production. Industria: Journal of Agro-Industry Technology and Management, 88-96.
ISO 31000, IO (2018). ISO 31000:2018 Risk Management - Guidelines. Switzerland: ISO Organization.
Joni. (2013). Analysis of Working Capital Needs and Cost Control Based on Cost Variance in Construction Projects. Scientific Journal of Civil Engineering.
Kountur. (2016). Easy Way of Integrated Risk Assessment – Quantitative Approach. Jakarta: RAP Indonesia.
Kountur, R. (2016). Operational Risk Management. Jakarta: PPM.
Lepar, F., Mandagi, R., & Lumeno, S. (2018). Risk Model at the Implementation Stage of Private Development Projects that Affect Project Performance. Jurnal Sipil Statik Vol.6 No.2 February, 125-136
Liu, H., & Tsai, Y. (2012). A Fuzzy Risk Assessment Approach for Occupational Hazards in the Construction Industry. Safety Science, 1067-1078.
Purwanto, E., & Gunarta, I. (2015). Determination of Electricity Selling Price Range and Investment Risk of Gas Turbine Rehabilitation at PT. X. Proceedings of the XXIII National Seminar on Technology Management, A-9-1 - A-9-7.
Rangkuti, F. (2012). Business & Investment Feasibility Study. Jakarta: Kompas Gramedia.
Saaty, T. (2008). Decision Making With The Analytic Hierarchy Process, International Journal of Services Sciences Volume 1.
Sandyavitri, A. (2008). Risk Analysis of Construction Project Development in Rural Areas (Case Study: Development of Clean Water and Transportation Infrastructure). National Seminar on Chemical Engineering Oleo & Petrochemical Indonesia 2008, 1-15.
Setiawan, A., Walujodjati, E., & Farida, I. (2014). Risk Management Analysis on Cisumdawu Toll Road Construction Project. Construction Journal of Garut Technology College, 1-11.
Sinulingga, S. (2013). Research Methods. Medan: USU Press.
Smith, N. (2008). Engineering Project Management. Leicester: John Wiley and Sons Ltd.
Sugiyono. (2012). Educational Research Methods, Educational Research Methods Quantitative, Qualitative, and R&D approaches. Bandung: CV. Alvabeta.
Suparno, & Wena, M. (2015). Risk Management in Construction Projects. Building Journal Vol. 20, No.1.
Susilo, L., & Kaho, V. (2018). Risk Management - A Guide for Risk Leaders and Risk Practitioners. Jakarta: Grasindo.
Syatauw, C. (2017). Analysis of Quality Risk Management in the Construction Implementation Phase of High-rise Buildings (Case Study: Apartments in Jakarta and Depok). Journal of Construction Design Volume 16 No.1, 10-20.
Triola, M. (2004). Elementary Statistics, 9th Edition. Pearson.
Utari, D., & et. al. (2014). Financial Management: A Study of Practice and Theory in Managing Corporate Organization Finances. Jakarta: Mitra Wacana Media.
Zhi, H. (1995). Risk management for overseas construction projects. International Journal of Project Management., 231-237